Dedicated Electrical Engineer with more than 06 years of hands-on experience in operations and maintenance of Electrical equipment inside plant premises including but not limited to Power House, Utilities, Polymer Plant (PLCs programming, troubleshooting), production department, and new projects installation and commissioning at Rupafil Limited having a solid work ethic and positive attitude, who loves to play badminton and is curious about the working of new era technology. Currently working for Samad Rubber Works Pvt Ltd as Sr. Assistant Manager Electrical, looking for an opportunity in a reputed organization which will help me deliver my best and upgrade my skills in engineering and meet the demands of the organization.
Operations and maintenance of electrical equipment inside the premises.
Responsible to ensure the reliable and smooth operation and maintenance activities of HFO (Daihatsu, 8DL-32) and GAS (Jenbacher, JGS 620), and Deisel (John Deere J66, Perkins, Nisan NE6, Mitsubishi, and Hino) engines. Consult manuals, schematics, wiring diagrams, and engineering personnel to troubleshoot and solve equipment problems for optimum functioning. Inspect and test equipment and circuits to identify malfunctions or defects using wiring diagrams and testing devices. Preparing Major Overhauling (MOH) and Top End Overhauling activities timeline in coordination with Power House staff and performing accordingly. Testing of Woodward Governor (UG-8), Fuel Shutdown device, Control Relays, Excitation System, and Battery Bank. Bench test of Generator Protection relays with Relay Tester (Severker 760), MV trolleys maintenance, VCB (IR test), bearing replacement of auxiliary motors, and maintaining records detailing tests, repairs, and maintenance activities. Calibration/testing of Engine and Alternator safeties after overhauling. Monthly inspection of Earth pits and maintaining preventive maintenance history data of faults. Performed laying/termination/IR test activity of HT XLPE cable (2x150mm2) from CFPP to existing Power House. Maintaining an inventory of spare parts for all equipment, requisitioning parts as necessary. Prepare specifications for purchases of materials or equipment. Preventive maintenance of HT/LT switchgear (VCBs (Shinko), ACBs (Terasaki)) and Transformers (J&P & Siemens) Dehydration, Dielectric strength test, Oil refilling periodically, and Silica Gel replacement. Maintenance and routine checking of LT Power Factor Improvement panels. (Nokian PFC N6/N12) Worked on troubleshooting and upgrading the Auto Load Shedding (ALS) system to avoid complete plant blackout. Planning/Notifying/Managing facility personnel about equipment shutdowns and start-up. Open and close switches to isolate defective relays.
Adnan is working in Rupali Polyester as Trainee engineer electrical